We first decided to have the concrete floors stained. A crew came and ripped up the carpet, scored the floors to look like tile and stained them a caramal and dark brown combination. Then we ordered some furniture, designed the kitchen and entertainment center, bought a tv and speakers, and prayed it would all come togther nicely one day.
It is still a work in progress, but starting to take shape. The floors are done, the entertainment center has been built and delivered, furniture is here (along with a new rug) and the speakers have been wired, installed and hooked up to a new tv. It's a lot more fun down here now!
The kitchen cabinets were installed today. Next step is to have black granite countertops installed. We also need to put the drawer pulls and door knobs on and pick out a sink.
This is the raised up bar top...still needs some black granite going across. We will have 2 or 3 bar stools here. |